Office Moving Checklist

Download Checklist in PDF Format (2.5 MB)

4 Weeks before the move

  • Meet with Rentacrate, your Mover and/or Move Consultant to finalize the move schedule.
  • Form Moving Supervisory Team to assist in delegation and implementation.
  • Finalize floor plan for new office and assign label and placard colors and department numbers to provide to your mover.
  • Prepare Move Communication Packets for your employees, providing the move schedule and instructions for Purging and/or Shredding and How to Use Rentacrates (the Pak-N-Stak™ Process). Rentacrate can provide literature for your employees.
  • Schedule and prepare agenda for your Employee Move Orientation Meeting.
  • Take inventory of all “High-Value” items in your office and note any pre-existing damage. Declare all high-value items to your mover in writing.
  • Contact your insurance agent to discuss coverage during your move.
  • Meet with your MIS Department to discuss special needs for moving IT equipment. Rentacrate can also meet with your MIS Department to explain the Pak-N-Stak™ Process for moving computers.

3 Weeks before the move

  • Conduct your Employee Move Orientation Meeting
  • Distribute Move Communication Packets to your employees.
  • Assign individuals to be on-site during the move to answer questions and supervise the process.
  • Distribute list of contact names and telephone numbers where contacts can be reached on the day of the move
  • Contact Building Management at your new location to review policies and procedures for move-in day.
  • Arrange loading dock and elevator reservations as appropriate at the origin and destination locations.

2 Weeks before the move

  • Communicate with your staff, encourage a successful purge process.
  • Make list of employees who will not be present for the move and assign an individual to pack and label their work area.
  • Assign individuals to pack and label common areas such as the kitchen, lounge, etc.
  • Draft an emergency contact list for vendors such as Rentacrate, Elevator Maintenance, Building Mgmt, Utilities, Telecom, and Moving Company.

1 Week before the move

  • Provide Placards to your Mover or Move Consultant to post at the destination site.
  • Confirm dock and elevator reservations and origin and destination locations.
  • Contact Building Management to confirm dates and times.
  • Conduct a Final Prep Meeting with Supervisory Team, Mover and Move Consultant. Review the move schedule and address any last minute needs.
  • Confirm the schedule of individuals who will attend the move and their roles.
  • Distribute 2-way radios and cell phones as appropriate for use during the move.
  • Distribute copies of floor plan to your move supervisors.
  • Designate a Lost and Found area at the destination site.

Moving Day

  • Make sure Move Supervisors are at their assigned posts at origin and destination facilities.
  • Monitor collection of Lost and Found items and identify where they should be delivered.
  • Conduct a thorough and final walk-through of the origin site with your mover to ensure that all items have been moved.
  • Assess completion of the move at the destination site and rearrange as necessary.

Post Move

  • Assign a crate collection site for empty crates.
  • Encourage employees to unpack quickly and bring their empty crates to the assigned location.
  • Complete regular walk-throughs of office space to identify crates which still need to be unpacked or brought to collection site.
Download Checklist in PDF Format (2.5 MB)

 


1-800-i-Crate-2
1-800-427-2832
Contact Us

© 2008 Rentacrate Incorporated. All Rights Reserved.
Site Map | Privacy Policy

this site designed by stellarsites - brilliant internet solutions